Playground Equipment Service & Ủng hộ
From factory quality control and global delivery to installation, BẢO TRÌ, spare parts, and after-sales technical support, Nhà máy Miland supports your project through each stage of delivery and operation.
Quality Control · Delivery · Installation · Maintenance · Spare Parts · Technical Support
Factory Quality Control Before Delivery
Before shipment, Miland carries out factory quality control to check structural alignment, moving-part performance, safety details, and surface finishing. For large playground structures, partial pre-assembly is also completed in advance to reduce installation errors and improve delivery quality.
Large frame structures, such as multi-level climbing systems and spiral slides, are partially pre-assembled in the factory to confirm hole alignment and structural fit.
Moving parts are checked through no-load operation tests to confirm smooth movement and stable performance before delivery.
The structure is inspected with EN 1176 test probes to verify that no pinch points or crush hazards are present.
PU painting, welding details, and soft padding are checked to confirm surface quality, finishing consistency, and protective strength.
Bao bì & Shipping for Global Playground Projects
After final quality inspection, each playground component is carefully packed according to its structure, vật liệu, and transportation requirements. Miland focuses on protecting equipment during international shipping while improving container utilization.
Packaging Protection Before International Shipping
Different components are protected with suitable materials, including EPE foam, bọc bong bóng, and stretch film, to reduce scratches and impact during transportation.
Components are organized according to their size, structure, và yêu cầu cài đặt, helping improve unloading efficiency and reduce installation confusion at the project site.
Shipping Options for International Playground Projects
Based on project location, schedule requirements, and budget considerations, Miland helps customers select suitable transportation solutions.
| phương thức vận chuyển | Khu vực phủ sóng chính | Thời gian vận chuyển ước tính | Ưu điểm chính |
|---|---|---|---|
| Vận tải đường bộ TIR Express | Trung Á, Nga, Châu Âu | 12–20 ngày |
|
| dịch vụ tàu chở hàng quốc tế | Trung Quốc đến châu Âu; dọc hành lang Trung Á | 15–22 ngày |
|
| Vận tải liên phương thức đường biển-đường sắt hiệu quả cao | Bắc Mỹ, Trung Đông, Đông Nam Á, Úc | 3–6 tuần |
|
Ghi chú: Transit time may vary depending on destination, customs clearance, and shipping conditions.
Playground equipment installation service
Sau khi giao hàng,Miland provides installation support for global projects through on-site guidance or remote technical assistance according to project requirements.
For projects requiring professional assistance, Miland can provide installation guidance to support equipment assembly and commissioning.
Detailed drawings, installation instructions, and technical support are provided to help local teams complete installation efficiently.
After-Sales Service & Long-Term Technical Support
After installation, Miland continues to provide technical support, hỗ trợ phụ tùng, and project documentation to help customers operate their playground equipment smoothly.

